• Elicon Superstructure Level W2000 D400
  •  For utilizing the area above the worktop as storage and functional surface with additional cabling option
  • Worktop height easily adjustable
  • Cable duct integrated in the crosspiece
  • Tiltable 0–10°
  • Worktop: 30 mm


Material / Finish

  • Superstructure worktop: three layer particle board, FP/Y E1 version, fire protection class B2, melamine coated (directly coated) edge banding, ABS 3mm

              fine textured, matt

  • Crosspiece: extruded aluminium, antistatic, powder-coated texture
  • Cable duct, horizontal: sheet steel, rolled, antistatic powder-coated texture

Colour combination

Final digit of order number .1:

  •  Superstructure worktop: light-grey
  •  Metal parts: RAL 7035 light-grey

Final digit of order number .5:

  • Superstructure worktop: beech finish
  • Metal parts: RAL 7021 dark-grey

Load rating

  • 750 N (static surface load)

Standards

  • DIN 68761 for superstructure worktop
  • DIN 68765 for direct coating

Note

  • Caution with use in tilted state; use edge
  • strip to prevent sliding

Supply schedule

  • 1 Superstructure worktop
  • 1 Crosspiece
  • Mounting material

Write a review

Note: HTML is not translated!
Captcha

Elicon Superstructure Level W2000 D400

0 reviews / Write a review

* Required fields



Related Product

Cable Internal 4pr UTP CAT6 305m/Roll - Grey

Cable Internal 4pr UTP CAT6 305m/Roll - Grey

Possible applications High speed data transmission cables are designed for horizontal cable dis..

AED 2.00

Cable Firekab 2C 1.5sqmm (NGF FE 180 PH30) 500m/Roll - White RAL9003

Cable Firekab 2C 1.5sqmm (NGF FE 180 PH30) 500m/Roll - White RAL9003

Cable Firekab 2C 1.5sqmm (NGF FE 180 PH30) 500m/Roll - White RAL9003..

BNC Plug 75 Ohms CR/CR G31 RG11A/U

BNC Plug 75 Ohms CR/CR G31 RG11A/U

The BNC series is the most commonly used coax connector. With its bayonet coupling mechanism this co..

AED 26.67

FO Splicer Swift F1 Kit With Soft Case + HF250L & HF250R

FO Splicer Swift F1 Kit With Soft Case + HF250L & HF250R

The Single All-In-One Device (strip, clean, cleave, splice, sleeve)Operation Time : 60 sec (incl. co..

AED 18,310.00