upply schedule
- 4 Node brackets (full installation)
- 2 Node brackets (shortened installation)
- 2 Z brackets (shortened installation)
- Mounting material
Mounting Kit 19" With 2 Nodes + Z Brackets
Related Product
Lightning current arrester, replacement module for 2/3-core signalling lines, 60 V DC, max. 1 A
Pluggable module, coupling impedance (R – resistance), line separated from protective earth via GDT..
FO Patch Cord 9/125 Dpx OS2 2.0mm LC/UPC-SC/UPC-20m LSOH.
Webb’s fibre optic patch cords are manufactured from high-quality optical fibre, terminated with st..
Internal gauge for pipes
Specificationø:kg85-115 mm2,40..
Hydraulic tensioners-puller for overhead lines stringing
Hydraulic machine suitable to operate as a tensioner or as a puller to string or recover t..





